Miller Park Tickets

One of the largest construction projects in Wisconsin history, Miller Park was constructed with more than $250million. This huge amount was all arranged from the public funds as the project started in 1996. The unique feature of the stadium is the retractable roof which is built in a convertible style. Thus the roof panels simultaneously open and close from first and third base side to the centre field. This massive and highly technical roof was the major factor in raising the cost of the stadium to almost $400 million.